Project Summary At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely conclusion of the project. Designed to reinforce ESG targets, the installation improves cooling reliability while lowering overall energy usage and CO₂ discharge. https://thebookmarkplaza.com/story20633089/advanced-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving