The plans also incorporate a big battery at the positioning, to be sure excessive electric power could be stored with the evening, as well as a 220 kV transmission line that will link the job on the North Star sub-station, in close proximity to where by a brand new a https://citypointsolar.com.au/30kw-solar-system/